Skip to main content

Posts

PROFESSIONAL ENGINEER (PE) VS PROFESSIONAL ENGINEER WITH PRACTISING CERTIFICATE (PEPC)

Back then in 2015, there were some, well sort of uproars in regard to restriction of “Engr.” abbreviation before the graduate engineers’ name. The privilege of “Engr.” originated under the Institution of Engineers Malaysia (IEM) and definitely became as the beacon for engineering graduates to submit their membership registration. The restriction was due to the Board of Engineers Malaysia ( BEM) argument that such abbreviation will be misconstrued by the publics as “Professional Engineer”. Professional Engineer is the highest testament for any engineers in Malaysia in pursuing their career or establishing their own consultancy practice. Since its inception, the primary goal of having the Professional Engineer “licensure” is to provide engineering services in full-scale and in accordance to Engineer’s Act 1967. In 2015, the Engineer’s Act 1967 was amended to enhance the quality of engineers and in quest for the liberalisation of engineering services. The action has resulted t

A Tale of Teamwork Delusion: Understanding the Embedded Culture of “Taichi” within the Construction Industry

Courtesy of Ram-Tech Construction Inc “Taichi” terminology was a norm word used by Malaysian as the act of shifting the blame / responsibilities to other individual or parties. Construction industry comprises of many teams from different fields. Some may have already known or works together while others are just total strangers. I would like to emphasize the four (4) primary players, the Architects, Civil & Structural Engineers, Quantity Surveyors and the Contractors. Architect will lead the team players and acts as the front line towards the respective clients. For design and build contracts, the contractors will be the pay master and appoint their own teams while the conventional contracts process appoint the team players separately. Good coordination is a must for the client to achieve their target and cost. Now, how would the “Taichi” fits into the picture? When one issue crop up and jeopardize the time frame and cost, all team players will scramble to issue thei

Judgement...The Important Correlation Between Wisdom and Qualification

Image Courtesy of life975.com I still remember the very first day that I had reported to duty as Design Engineer in a small Engineering Consulting Firm. My superior simply handed over a sketched structural key plan and instructed me to perform the structural analysis and design. I did as he requested. Well, as many of the typical fresh graduate traits, I design strictly as what I had learned in the university. However, the nagging feeling of uncertainty struck me. Although I manage to design according to the codes, I am still unsure if the design was workable or not on site. Then, I refer my work to my superior. Mind you, he has more than 15 years of experience in structural engineering. Only two (2) things he looks at, the load and the sizing / reinforcement of the beams and columns. Within a minute his verdicts was: my design is not workable based on his "judgement" . I was instructed to review my design. So, how to develop the so-called engineering judgement

WIND OF CHANGE FOR ENGINEERS

On April 18, 2015, The Institution of Engineers Malaysia (IEM) held the 56th Annual Dinner at Sime Darby Convention Centre in Kuala Lumpur. The prime interest would be on the keynote on "Liberalisation of Engineering Services - The Wings For Engineers to Soar" by IEM President Dato' Ir. Lim Chow Hock. So, what is it in the keynote speech that would benefit us, the typical engineer :). Will liberalisation bring forth more invaluable opportunities or will it open the floodgate of foreign engineers to our small market? Some small players already spooked by the liberalisation of engineering services as they fear it will crowd the market and perhaps leave them out of business. To be fair, such perceived fears are understandable since the local players trying to protect their business and the influx of foreign engineering services may start of the bloody competition war. On the bright side, the local engineering firms also have the golden opportunities to export th

Talk on “Tendering Process – the art and science of it.” - Why negotiated / restricted tenders are not desirable

Venue: Wisma IEM, 01- Auditorium Tan Sri Prof. Chin Fung Kee, Third Floor Date & Time: 02 Dec 2014 (5:30 PM - 7:30 PM) CPD/PDP: 2 Closing Date Before: 29-Nov-2014 Register here SYNOPSIS  All constructed buildings and installations begin with an intention to do so. These thoughts are subsequently crystallized into a Client / Consultant produced tender document. This document is then tagged as the Intention to Bid (ITB) document by the bidder and / or contractor. The interested bidder then puts together a proposal based on the scope of works within the ITB document for the project. Therefore, in the process, the bidder has to make an INFORMED CHOICE / DECISION based on the RISK MANAGEMENT of carrying out the said project. In most large companies, tenders are acquired by the Business Development unit for consideration. The company management then strategically addresses the tender for the highest success rate. The Contract Services Dept. in association with the Procureme